West Memphis Railroad: April 2005
AccuModel constructed to show the extreme angle of the road at the crossing causing drivers a difficult sightline down the tracks.

  • 8 foot long / 2.5 feet wide
  • Broke down into two 4 foot pieces with custom built shipping containers
  • Built at HO scale (1:87)
  • Survey and aerial photos used to establish scale.


Loading Dock: March 2006
AccuModel constructed to show the jury an incident where a delivery truck slid on the ice while parked at the dock causing injuries to the pallet jack operator.

  • Constructed completely with lightweight Foam-Core® and Gator-Board®
  • Broke down into 4 pieces with custom shipping containers
  • Functional dock plate with see through semi trailer
 

Wolf 3 Seasons: June 2006
AccuModel constructed to show our modeling capabilities in any type of weather.

  • Constructed for marketing purposes
  • Broke down into 3 pieces with fully functional streetlights and RR crossing lights.

Kentucky Haul Road: April 2008
AccuModel constructed to show the jury an incident where a poorly designed run-off ramp caused one fatality and serious injuries to the passenger.

  • 16 foot long / 2.5 feet wide /broke down into 5 pieces
  • Built at HO scale (1:87)
  • Survey data used to establish accurate scale and accurate grade
 
HyperVideo Courtrrom Exhibits 3-D Video Graphics Image Analysis Accu-Models HOME Graphic Design Wolf Technical Services, Inc. Contact Us Gallery:Graphic Design Portfolio Gallery:Courtroom Exhibits Gallery:Medical Animation Clips Gallery:3-D Video Graphic Clips HyperVideo Clips Case Studies Case Studies Articles F A Q Staff