Beginning in 2005, Wolf decided to expand our capabilities to include product design with a focus on safety for our men and women in the military.
Our staff has a breadth of past experience in the aerospace and defense industries, including development of cruise missile optical guidance systems (optical- and laser-based), real time test equipment, instrumentation, manufacturing engineering and flight testing. Fast forward to the present and Wolf’s engineering design staffers have been very successful at winning and working Small Business Innovation Research (SBIR) contracts for the Department of Defense.
Here’s a summary of our SBIR projects:
Award Title | Agency | Branch | Phase | Contract Award |
---|---|---|---|
Aircrew-Mounted Self-Adjusting Tether System | Department of Defense – Navy | Phase II | 6-Dec-19 |
A Universal Device for Performing Cricothyrotomies | Department of Defense – DHP | Phase II Enhancement | 11-Jul-18 |
Aircrew-Mounted Self-Adjusting Tether System | Department of Defense – Navy | Phase I | 5-Feb-18 |
Daylight Glare Reduction Using a Light-Field Camera | Department of Defense – Air Force | Phase I | 10-Nov-17 |
Intranasal Brain Cooling | Department of Defense – Marines | Phase I | 9-Aug-17 |
Back Extraction Blast Seat | Department of Defense – Army | Phase I | 26-Aug-16 |
Energy Absorbing Seat for All Occupant Sizes and Blast Conditions | Department of Defense – Army | Phase I | 22-Sep-15 |
A Universal Device for Performing Cricothyrotomies | Department of Defense – DHP | Phase II | 11-May-15 |
A Universal Device for Performing Cricothyrotomies | Department of Defense – DHP | Phase I | 18-Mar-14 |
Modular Anthropomorphic Test Device (ATD) for Blast Testing | Department of Defense – Marines | Phase II | 27-Jun-13 |
Robotic Eddy Current Condenser Inspection Equipment Capability | Department of Defense – Navy | Phase II | 20-Jun-13 |
Modular Anthropomorphic Test Device (ATD) for Blast Testing | Department of Defense – Marines | Phase I | 15-Nov-11 |
Digital Flight Gloves | Department of Defense – Air Force | Phase I | 1-Mar-11 |
Robotic Eddy Current Condenser Inspection Equipment Capability | Department of Defense – Navy | Phase I | 12-Aug-11 |
Vehicle Payload Detection at Low Speeds through Weigh-in-Motion (WIMS) | Department of Defense – Army | Phase II | 22-Aug-10 |
Vehicle Payload Detection at Low Speeds through Weigh-in-Motion (WIMS) | Department of Defense – Army | Phase I | 12-Nov-09 |
Common Mobile Aircrew Restraint System (Non-SBIR) | Department of Defense – Navy | Prime Contract | 10-Sep-09 |
Innovative Research for Crashworthy Stowable Troop Seating for Helicopters | Department of Defense – Air Force | Phase II | 15-May-09 |
Innovative Research for Crashworthy Stowable Troop Seating for Helicopters | Department of Defense – Air Force | Phase I | 25-Apr-08 |
Semi-Active Damped Seating Technology for the EFV | Department of Defense – Navy | Phase I | 7-Feb-07 |
Helicopter Aircrew Restraint | Department of Defense – Air Force | Phase II | 15-Apr-05 |
Helicopter Aircrew Restraint | Department of Defense – Air Force | Phase I | 15-Apr-05 |